November 27, 2009 at 7:27 pm
Symptom
When clicking on logistics area value help in production task screen, a dump occurs when the product planning unit of measure (UoM) is different than the inventory UoM.
Other terms
LSDL, logistics area value help, supply to production, task confirmation.
Reason and Prerequisites
The results in the logistics area value help screen are displayed in inventory UoM. [...]
July 19, 2009 at 8:20 pm
Symptom
Production planning order status not being updated after production order is canceled.
Other terms
Production request; production order; requested date; production request confirmation; A2A message
Reason and Prerequisites
It has been determined that the production request confirmation message is not sent if the requested date and the confirmed date are equal (i.e. scheduling did not change the [...]
July 14, 2009 at 7:23 am
Symptom
You try to integrate PDS that with procedures assigned that are using operator ‘||’. During integration the operator ‘||’ is replaced by ‘//’, which leads to syntax errors on APO side. As result the integration aborts.
Other terms
PDS, Production Data Structure
Reason and Prerequisites
During transfer a standard syntax check is done. This includes a [...]
July 14, 2009 at 7:22 am
Symptom
The result of tracing the evaluation of object dependencies during PDS simulation within transaction /SAPAPO/CURTO_SIMU is truncated to 50 chars per line.
Other terms
PDS, Production Data Structure, TRACEON, Procedures, Selection Conditions, /SAPAPO/CURTO_SIMU
Reason and Prerequisites
Programming Error.
Solution
Please implement this note in SCM.
Manual steps are necesarry:
1. Open Transaction SE91 and change message 009 of message class CULL_TRACE as [...]
June 23, 2009 at 2:38 am
Symptom
Printing a production task in Chinese language the result is in English language.
Other terms
Printing
Reason and Prerequisites
In the production task agent the business partner calculated wrong, therefore the field sender_country_code will not calculated.
This correction is to be shipped as a Hot Fix for FP2.0,SP1,FP2.5
Solution
The correction for FP2.0 is shipped with transport request number
H0EK002310.
The correction for [...]